logo elektroda
logo elektroda
X
logo elektroda

Vaillant ecoTEC plus VUW Wiring Diagram Guide

User question

Vaillant ecoTEC plus VUW electric diagram

Artificial Intelligence Response

Direct answer to the question

  • The official electrical (wiring) diagrams for any Vaillant ecoTEC plus VUW boiler are printed in the appliance’s “Installation and Servicing Instructions”.
  • For the current UK/IE documentation (part-number 0020244997 _07) the diagrams start on page 64 (Section “H – Wiring diagrams”) and are split into four sheets:
    • Heating-only 12-35 kW • Heating-only ≥37 kW
    • Combi (integrated DHW) 12-35 kW • Combi ≥37 kW
  • You can download the manual free of charge from Vaillant’s professional portal or from publicly mirrored links such as:
    https://professional.vaillant.co.uk/downloads/product-manuals/ecotec-plus-1/ecotec-plus-combi-and-system-installation-instructions-2422739.pdf
    (Manual page 64 ff. / PDF page 66 ff.)

Key points • Identify the exact model designation (e.g. VUW 286/5-5) – diagram sheets differ in connector counts and accessory options.
• Use only the sheet that matches both power band and DHW capability.
• All live (230 V~) and safety-critical connections are clearly separated from 24 V SELV (Safety Extra-Low Voltage) on the drawings.
• Work must be carried out by a competent, suitably certified engineer – this is a gas appliance subject to national regulations.

Detailed problem analysis

The ecoTEC plus VUW family is a wall-hung condensing combi boiler (“VUW” = gas-fired combination appliance for Versorgung u. Warmwasser). Each variant shares a common electrical architecture organised around the main control PCB (“eBUS board”). The wiring diagram is therefore split into functional blocks:

  1. Mains input & internal power supply
    • Connector X1: L, N, PE (earth) via 3.15 A quick-blow fuse (F1).
    • SMPS on the PCB delivers +24 V DC (protected by fuse F2) and +5 V logic rails.

  2. High-voltage loads (switched 230 V~)
    • Fan (X11), Pump (X24), Diverter-valve motor (X41), Ignition transformer (X16).
    • Driven by PCB relay outputs; depicted on the diagram with dashed safety interlocks.

  3. Low-voltage SELV loads and sensors
    • Modulating gas valve (X25, 24 V DC, PWM).
    • NTC temperature sensors (flow, return, DHW); shown as variable resistors.
    • Water pressure sensor (X22) and Hall-type flow sensor for DHW recognition.

  4. Communication & external controls
    • eBUS (X100, polarity-free twin core) for Vaillant VRC/VRT controls.
    • 24 V room-thermostat interface (RT) and 230 V switched-live interface (STB) – only one may be used at a time; factory link provided.
    • Burner-off contact and fault relay output for BMS integration.

  5. Safety chain
    • Over-temperature stat, flue gas sensor, air-pressure switch (if fitted) and ionisation detection form a redundant shut-down path; depicted with thick outline on the diagram.
    • Each safety device is shown in its safe (normally-closed) state.

Connector legend (most frequent across 5-5 generation)
X1 … mains, X2 … front-panel interface, X11 … fan, X12 … ignition, X16 … pump (new HE pumps use PWM+Hall return), X18 … diverter, X20 … low-voltage bus, X22 … pressure, X24 … external 230 V RT, X25 … gas valve, X30/31 … NTC sensors, X41 … PWM pump supply.

Colour code (EN 60757 / Vaillant convention)
BN = brown (Live) BU = blue (Neutral) GN/YE = earth GY = grey (signal) WH = white (sensor). Low-voltage pairs often orange or violet.

Practical reading tips

  1. Compare connector number on the diagram with silkscreen on PCB – they match physically.
  2. Heavy double lines indicate mains-carry­ing traces; thin single lines are SELV.
  3. Failure diagnostics (e.g. F.28 ignition) can be carried out by tracing the sequence shown: relay K6 energises → 230 V appears at X12-1/2 → spark generator → flame rectification path via ionisation probe back to X2-2.

Current information and trends

• The latest ecoTEC plus generation (6/5-7) keeps the same connector nomenclature but introduces LIN-bus high-efficiency pumps instead of PWM. The manual revision 0020274719_02 (2023) reflects this.
• Vaillant is gradually migrating from proprietary eBUS to VCI (Vaillant CAN Interface) for hybrid systems; forthcoming manuals will add CAN wiring to the diagrams.
• Opentherm is still not native; it requires the VR 33 or VR 34 interface board – shown as module X90 on the newest diagrams.

Supporting explanations and details

Example: reading the “Combi 12–35 kW” sheet

  • The upper half is the power schematic (physical wiring); the lower half is the functional block diagram showing control logic.
  • Look for the jumper JP1 between terminals 3-4 (RT). Removal enables external 230 V thermostat.
  • If fitting a weather-compensating controller: use eBUS at X100; do not connect to RT, remove factory link, leave RT open.

Analogy: treat the control PCB like an automotive ECU. 24 V DC is its “battery”, NTC sensors are “engine sensors”, gas valve = “injector”, fan = “turbo”. The wiring diagram is therefore similar to a car wiring loom map.

Ethical and legal aspects

• In the UK, electrical work inside a gas boiler is governed by Part P of the Building Regulations and Gas Safety (Installation & Use) Regs 1998. Similar laws apply EU-wide (Directive 2009/142/EC, now Regulation (EU) 2016/426 – GAR).
• The diagram is copyrighted by Vaillant Group; redistribution for commercial purposes is prohibited. Provide the link, not a scanned clip, unless you have Vaillant’s written permission.
• Only Gas Safe (UK) / RGI (IE) / certified installers may break the combustion-sealed case.

Practical guidelines

  1. Identify appliance variant from data-plate.
  2. Download correct manual revision (or order from Vaillant).
  3. Print the relevant sheet in A3 if possible; laminate for workshop use.
  4. Before probing, isolate at double-pole fused spur, prove dead.
  5. Use a CAT III 600 V meter for mains, a CAT II 300 V meter for SELV.
  6. Record voltage waveforms (e.g. PWM to pump ~1 kHz) with a DSO if diagnosing intermittent faults.
  7. When adding controls, leave factory links in a zip-tied bag inside the boiler for future engineers.

Potential challenges & mitigation
• Mis-identifying connectors (X24 vs X24a) – always cross-reference the component list in the manual.
• Mixed-voltage conduit – use segregated trunking; maintain ≥6 mm clearance between 24 V and 230 V conductors.
• Condensation inside the harness – if the diagram shows “drip loop”, reproduce it exactly.

Possible disclaimers or additional notes

  • Diagrams vary between software versions of the PCB (index -5, -6, -7). Always refer to the serial number range shown in the manual’s front page.
  • Early ecoTEC plus (3/5 generation) had separate ignition PCB; the diagram looks different – do not mix!
  • Where Fe flow sensor is present, colours differ (red/black twisted pair).

Suggestions for further research

• Examine Vaillant Service Bulletin SB-008-2022 for updated pin-outs when retro-fitting VR 720 f weather sensor.
• Monitor emerging CAN-based control (VCI) – expected to replace eBUS after 2025.
• Investigate hydrogen-ready versions (H2 20 %) – additional flame ionisation electronics, new symbols to appear on diagrams.
• Resources: Vaillant “ServiceTech” app (Android/iOS) – interactive wiring diagram navigator; IET Code of Practice for In-service Inspection and Testing of Electrical Equipment (PAT) for annual checks.

Brief summary

The electrical diagram you need is in the official Vaillant ecoTEC plus VUW Installation & Service manual (e.g. doc #0020244997 _07, pages 64-71). Select the sheet that matches your model’s power band and DHW configuration. The drawing shows all mains, SELV, sensor, pump, fan and external control connections with connector numbers (X1 … X100), making diagnosis or integration straightforward. Always isolate, follow national gas/electrical regulations and, if in doubt, engage a certified engineer.

Ask additional question

Wait...(2min)
Disclaimer: The responses provided by artificial intelligence (language model) may be inaccurate and misleading. Elektroda is not responsible for the accuracy, reliability, or completeness of the presented information. All responses should be verified by the user.