Tariff G11 and the contracted capacity does it affect the price

Elektronik2013 29358 11
ADVERTISEMENT
Treść została przetłumaczona polish » english Zobacz oryginalną wersję tematu
  • #1 15404840
    Elektronik2013
    Level 11  
    Hello. In the G11 tariff, from what is known, the monthly fee does not depend on the contracted capacity, so I think it is best to give this power equal to the connection capacity? If there is a protection, for example 3x20A and a connection power of 12kW, the contracted power for G11 can be given 12kW, although I will not use it for now, as well as 7kW. Does this contract power at G11 have any significance? I saw a contracted power of 8kW as well as 34kW on the bills with 3x50A security. I emphasize that I am only asking about the G11 tariff because I know that in others it is of great importance.
  • ADVERTISEMENT
  • #2 15404888
    spinacz
    Level 42  
    The contracted capacity in the G tariffs does not matter in the charges, the charges for capacity are collected in the C tariffs.
  • ADVERTISEMENT
  • #3 15408313
    szejdi18
    Level 11  
    I do not know 100%, but it seems to me that it may have an impact on the fees, and more precisely on the amount of the advance payment that we make for the next billing period. Although it is possible that in this tariff it does not matter, as my colleague mentioned above.
  • ADVERTISEMENT
  • #4 15408355
    janek1815
    Level 38  
    This does not affect the value of the advance payment. And even if the advance payment was higher, one call to the Customer Service Center is enough and it will be set at the level you want. As common sense, of course.
  • #5 16454577
    llopacinski
    Level 11  
    Today I called ENEA with the same question: does the size of the meter protection matter to the amount of the bill and I heard 2 times from 2 different people that it did. And less amps and less power, the lower the bill ... Do they not know what they are saying or something has changed in this topic? I am at the stage of connecting electricity to the garage, so I understand that I will get a G11 and the size of the security should not affect the amount of the bill. What is going on? Has something changed?
  • #6 16454682
    nuszek
    Level 30  
    The fee is for the contracted power / maybe not so much as the contract, but the connection / in G11, but one-time and depending on the operator from PLN 100 to 150 per 1 kWh.
  • #7 16454697
    Anonymous
    Anonymous  
  • #8 16454700
    llopacinski
    Level 11  
    I know that, each next kW costs about PLN 80 gross, but I asked my grandfathers if the monthly electricity bills would also be higher, and they tell me they would ... I ask how much they will be higher, and they say that they do not know how much but they will definitely be higher ...

    I do not know whether to take this connection power a bit exaggerated to have stronger fuses (e.g. 20A or 25A), or a minimum (16A) to lower the bills every month ... I read something else, and these energy grandfathers say something else ...

    Added after 5 [minutes]:

    WojcikW wrote:
    llopacinski wrote:
    ... I am at the stage of connecting the electricity to the garage, so I understand that I will get G11 ...
    Why should the garage have a G11? The G11 tariff is a reduced tariff for households.


    from what I read this for garages is allegedly G11:

    "Tariff G also includes electricity consumption in summer houses or garages."
    https://enerad.pl/rynek-energii/prad-dla-domu/taryfa-g11/

    In total, all the descriptions that I read assume G11 for garages and the same bill every month, regardless of the pre-meter protection ... so much that in enea they say something else and they cannot explain why ...
  • ADVERTISEMENT
  • #9 16454743
    stomat
    Level 38  
    Dziad is unable to read and understand the tariff and returns the guitar to consultants :)
    In G tariffs, the contracted capacity does not affect the amount of fees, but it does affect whether the measuring system is single-phase or three-phase.
  • #10 16454745
    Strumien swiadomosci swia
    Level 43  
    Let's set a monthly cost of operation G11 is not dependent on any power.
  • #11 16454857
    zbich70
    Level 43  
    Strumien swiadomosci swia wrote:
    Let's set a monthly cost of operation G11 is not dependent on any power.

    End. Dot. Topic cleared up.

Topic summary

The discussion centers around the G11 tariff and its relationship with contracted capacity and billing. Participants clarify that in the G11 tariff, the contracted capacity does not influence the monthly fees, which are fixed regardless of the connection capacity. Some users express confusion, citing conflicting information from customer service representatives regarding the impact of meter protection size on billing. It is emphasized that the G11 tariff is primarily for household use, and the contracted power does not affect the advance payment or monthly costs. The conversation concludes with a consensus that the G11 tariff operates independently of contracted capacity in terms of billing.