Suppose we are going to design a plant power distribution network with some MV and LV loads and buses. If we design our LV network as TNC-S, where is the best point in our LV network to separate neutral conductor from PE conductor? Is it in the main LV switchgear or in the downstream MCCs or even the more downstream distribution panels?