Hi Farah-The key word here is "synchronized". All of the inverters will need to be carefully synchronized before this will be possible. Even if they are already synchronized they will need the ability to "load share". Load sharing is generally implemented by allowing an inverter to deliver current up to its maximum, and when it approaches maximum it will limit current rather than shutting down. The ability to connect the output of multiple inverters together will need to be part of the original design of the inverters, and not a circuit that can be added externally.-Rick
Just as an aside, you could probably do this by having one master standalone inverter and then connect Grid-connect inverters to that output. The grid-connect inverters will synchronize to the master inverter. This is the technology used in Solar domestic installations.