I have an existing diesel generator that I would to replace. Its current size is a 400KW 480v 60HZ. I have 7 autmatic transfer switches and 1 manual swtich for diferent buildings. According to report receive monthly load testing is performed in each individual automatic transfer switch, in order for to determine the existing load or the historical maximum load, should the testing have been performed in all ATS at the same time to get that historical load? Please let me know.
Thanks
Thanks