Hi. I was watching this tv program, Meggar Engineering. this documentary was on a skyscraper in the UAE, I don't quite remember the name but it was a building well over 300 metres high.
I saw cables running all through from the basement to the top, and not busbars. could someone please explain why the engineer would do this - choose cables over busbar system for such a building??
Thank you
Koffy
I saw cables running all through from the basement to the top, and not busbars. could someone please explain why the engineer would do this - choose cables over busbar system for such a building??
Thank you
Koffy