Sorry for mistake I rushed in the morning to work and crept in the mistake, I measured the capacity of the charger Turnigy Accucell 6 and one section gave about 3Ah, the other two sections have not yet tested voltage is similar at all links.
Electronics board on the other hand has only soldered connector and wires all electronics is visible in the picture that I put, eeprom is ATML H812 Pony Prog detects 512Kb of memory. The electronics are eeprom ATML H812, pwm TC649 controller, five subassemblies in sot 23 housings 2pcs A7W, 2pcs 6A2, 1pcs 1AM, 1pc Z3, several resistors and capacitors.