logo elektroda
logo elektroda
X
logo elektroda

SEP and various types of qualifications and permissions - what to eat

6234 5
ADVERTISEMENT
Treść została przetłumaczona polish » english Zobacz oryginalną wersję tematu
  • #1 16872737
    Anonymous
    Anonymous  
  • ADVERTISEMENT
  • ADVERTISEMENT
  • #3 16873055
    Anonymous
    Anonymous  
  • ADVERTISEMENT
  • #4 16873635
    bartosz.tarnowski
    Level 17  
    proposes to contact the SEP unit.
    I did SEP 2 years ago on E and recently I made an installation for which I needed a man with D.
    I saw various protocol templates, which is a mess for me, or a lack of specification.
  • ADVERTISEMENT
  • #5 16873771
    Anonymous
    Anonymous  
  • #6 16874836
    Akrzy74
    Rest in Peace
    melaniamela wrote:
    I mean trainings organized by SEP
    I need:
    - permission to install electrical installations up to 1.5kV
    - maintenance of these installations
    - technical acceptance

    - rights to build gas installations
    - authorization for technical acceptance

    - permission to build a water and sewage system.
    - technical acceptance of these installations

    There is so much in SEP that I don't know where to start.

    What a colleague "needs" should be noted in the appropriate application.
    melaniamela wrote:
    What is the difference between qualifications and qualifications?

    First from the edge - please read what is written and remember for the future:
    link
    Does using the search engine really hurt (rhetorical question)?

    I close.
ADVERTISEMENT